•   Japan Time:

  •   Stock: 27

  • WhatsApp: +81 80‑4411‑3239
  • Language :  
Sale
Tap on the above image to see more pictures.
Share :

2013 MAZDA CX-5 KE2AW

Car Specifications    --

  • --
  • 43800 KM
  • Diesel
  • Automatic
  • Red
  • Stock No.
    00048031
  • Condition
    Used
  • Location
    --
  • Fuel
    Diesel
  • Make
    MAZDA
  • Model
    CX-5
  • Mileage
    43800 KM
  • Body Type
    --
  • Exterior Color
    Red
  • Model Code
    KE2AW
  • Engine
    2,200cc
  • Steering
    --
  • Chassis No
    KE2AW-1****
  • Seats
    5
  • Transmission
    Automatic
  • REG Year/Month
    2013/08
  • LxWxH
    (L)4.54 x (W)1.84 x (H)1.71 m
  • M3 Size
    14.29
  • Engine Model
  • Interior Color
    --

Accessories

Airbag Anti-Lock Brakes Power Steering A/C Navigation System Power Windows Alloy Wheels

Important Notice

SAWAMOTOR Japan shall not be responsible for any preexisting loss, dents , scratch and damages already presented in the photos.

SAWAMOTOR Japan will export the vehicles "As is" unless requested otherwise by the customer.

You need to look up the Import Regulation of your country for this unit..

×

Get a Free Quotation

Inquiry Image
Choose Final Country*
Select your vehicle's destination country.
 
Destination Port Transit Time Estimated Freight

Additional Options

  • Insurance
  • Inspection
C&F 4856 USD