•   Japan Time:

  •   Stock: 27

  • WhatsApp: +81 80‑4411‑3239
  • Language :  
Sale
Tap on the above image to see more pictures.
Share :

2019 TOYOTA VOXY ZRR80W

Car Specifications    --

  • --
  • 96459 KM
  • Gasoline
  • CVT
  • Pearl
  • Stock No.
    00073405
  • Condition
    Used
  • Location
    --
  • Fuel
    Gasoline
  • Make
    TOYOTA
  • Model
    VOXY
  • Mileage
    96459 KM
  • Body Type
    Van
  • Exterior Color
    Pearl
  • Model Code
    ZRR80W
  • Engine
    2,000cc
  • Steering
    Right
  • Chassis No
    ZRR80-0****
  • Seats
    8
  • Transmission
    CVT
  • REG Year/Month
    2019/09
  • LxWxH
    (L)4.71 x (W)1.73 x (H)1.82 m
  • M3 Size
    14.83
  • Engine Model
  • Interior Color
    --

Accessories

Airbag Anti-Lock Brakes Remote Keyless Entry Navigation System Cruise Control CD Player DVD Alloy Wheels Third Row Seats Power Slide Door

Important Notice

SAWAMOTOR Japan shall not be responsible for any preexisting loss, dents , scratch and damages already presented in the photos.

SAWAMOTOR Japan will export the vehicles "As is" unless requested otherwise by the customer.

You need to look up the Import Regulation of your country for this unit..

×

Get a Free Quotation

Inquiry Image
Choose Final Country*
Select your vehicle's destination country.
 
Destination Port Transit Time Estimated Freight

Additional Options

  • Insurance
  • Inspection
C&F 13712 USD